ny ellebjerg stationConstruction |
|||
We design, produce, transport and assemble bridges, stairs, lift towers and platform roofs. The lift towers were delivered ready-assembled with glazing from our own factory in Grenaa. The steel contract is for 1200 tonnes of steel. The largest bridge sections measure 5 x 72 m and the heaviest lifts are 120 tonnes, with a total weight of 151 and 192 tonnes. Contacts:MICHAEL FONVIG HALD NIELS PETER STEFFENSEN MADS MÜLLER-HANSEN RICKY RØLLE |
|