HSM Industri was in charge of the expansion of the 350 meters long Hallssti near Aarhus. The bike path was extended with 2 meters to make room for both pedestrians and cyclists. A special steel structure with a new bridge deck was required. Since the bike path runs right next to the train tracks and the terrain slopes down towards the tracks, the bike path was supported by approx. 100 screw anchors driven 6 meters vertically into the terrain. The bridge decks forming the bike path consisted of 45 prefabricated items that were assembled during the month of June 2018

  