Production and assembly of a 102 tonne and 53.6 m long motorway bridge (pedestrian bridge).
In fact, the actual bridge "only" weighs 54 tonnes; the remaining 48 tonnes are ballast filled into the members. They were filled to give the bridge the right design with column height and pre-tensioning.
One of Denmark's largest BMS cranes (500 tonne mobile crane) lifted the bridge into place.
Contacts:
MICHAEL FONVIG HALD T: +45 61 51 71 91 M: mh@hsm.dk
NIELS PETER STEFFENSEN T: +45 21 21 55 73 M: nps@hsm.dk
RICKY RØLLE T: +45 41 61 77 48 M: rr@hsm.dk
MADS MÜLLER-HANSEN T: +45 22 43 75 24 M: mmh@hsm.dk
|