24H phone: 24H Phone: +45 86 32 66 66

Pedestrian bridge for Sorø Municipality

Production and assembly a motorway bridge (pedestrian bridge).

Production and assembly of a 102 tonne and 53.6 m long motorway bridge (pedestrian bridge).

In fact, the actual bridge "only" weighs 54 tonnes; the remaining 48 tonnes are ballast filled into the members. They were filled to give the bridge the right design with column height and pre-tensioning.

One of Denmark's largest BMS cranes (500 tonne mobile crane) lifted the bridge into place.

Contacts:

MICHAEL FONVIG HALD
T: +45 61 51 71 91
M: mh@hsm.dk

NIELS PETER STEFFENSEN
T: +45 21 21 55 73
M: nps@hsm.dk

RICKY RØLLE
T: +45 41 61 77 48
M: rr@hsm.dk

MADS MÜLLER-HANSEN
T: +45 22 43 75 24
M: mmh@hsm.dk