Footbridge, stairs - Hellerup Station

Works by railway lines

Our technical department designed the 60 m footbridge and the four stairway towers. In addition to planning, we produced all of it at our workshop in Grenaa. The bridge was made and transported in two sections to Hellerup Station. The bridge and stairs were mounted during two nights, where the railway line was closed completely.